Official Alfanar Projects logo
Strategic marketing research · Six-part report

Alfanar Projects
Corporate & Digital Market Assessment

Group structure, target markets, competitive landscape, institutional stakeholders, and social-media performance.

Strategic assessment · My recommendations · Execution roadmap · 18 October 2026
Official group structure ↗
01

Alfanar Group – Corporate Structure

Corporate imagery & brand material

Alfanar Projects official corporate profile

I use Alfanar Projects’ published corporate profile as a visual reference for its capabilities, sector experience and brand positioning.

Open original corporate profile ↗
Alfanar Projects corporate profile cover

My assessment starts with Alfanar Group’s three main divisions and the specialized business arms and units within Alfanar Projects, as presented on the company’s official group-structure page.

1. Group hierarchy
Alfanar Group
Alfanar Electric Manufacturing
Alfanar Building Systems Building systems
Alfanar Projects Projects & services

Alfanar Projects – Five main arms

Alfanar Engineering Construction
Alfanar Global Development (AGD)
Alfanar Digital Solutions (ADS)
Alfanar Steel Structures
Alfanar Engineering Services (AES)
  • Technical Services
  • Calibration Services
  • Operation & Maintenance
  • Testing & Commissioning

2. Group divisions and responsibilities

DivisionMain activities
Alfanar ElectricManufacturing electrical and electronic products for B2B and B2C markets.
Alfanar Building SystemsManufacturing precast and prestressed concrete structures.
Alfanar ProjectsProject development, engineering construction, engineering services, and digital solutions.

3. Alfanar Projects – Detailed structure

Brand / business armResponsibilities
Alfanar Engineering ConstructionEngineering, procurement and construction under EPC, EPCM and LSTK contract models.
Alfanar Global Development (AGD)Project development, financing, design, construction and operation across energy, water, healthcare and infrastructure.
Alfanar Digital Solutions (ADS)Systems integration, cybersecurity, cloud computing, AI, machine learning and data analytics.
Alfanar Steel StructuresDesign, fabrication, galvanization, supply and erection of steel structures.
Alfanar Engineering Services (AES)Technical repair services, calibration, testing and commissioning, and operation and maintenance.

4. Important distinction for marketing strategy

I distinguish between the corporate group structure, operating brands and six market-facing business lines. This distinction informs my recommendations for brand architecture, content ownership and market positioning.

⚡ Grid☀ Renewable Energy≈ Water▥ Infrastructure⬡ Process⌘ Digital
These are commercial business lines, not necessarily separate companies or legal entities. This distinction affects website architecture, SEO, AI-search visibility, content ownership and master-brand strategy.

Source: Alfanar Projects – Group Structure.

02

Primary Markets & Top Competitors

Saudi Arabia is Alfanar Projects' core market. Its wider footprint includes the Middle East, Europe and India. Key sectors include power infrastructure, grid engineering, renewable energy, EPC contracting and project development.

1. Primary geographic markets

PriorityMarketMain business opportunities
CoreSaudi ArabiaPower grids, substations, renewable energy, infrastructure, water, digital transformation
HighUAE & BahrainGrid infrastructure, engineering construction, energy projects
HighEgyptRenewable energy, wind, solar, green hydrogen
HighUnited KingdomSustainable aviation fuel, clean energy, project development
HighSpainWind energy, renewable project development
EstablishedIndiaWind energy development, turbine technology
Additional presenceGermany, Italy, TurkeyInternational business presence; project-scale priorities need further validation

I use these priority labels to guide marketing focus; they do not represent official revenue-based market rankings.

2. Primary industries

Business linePrimary target customers
Grid & PowerUtilities, national grid operators, government energy authorities
Renewable EnergyEnergy developers, utilities, IPPs, government renewable programs
InfrastructureGovernment entities, mega-project developers, transportation and infrastructure authorities
WaterWater authorities, desalination developers, utility operators
Process & IndustrialIndustrial manufacturers, energy companies, process plant developers
Digital SolutionsGovernment, utilities, infrastructure operators, large enterprises
HealthcareHealthcare authorities, hospitals, public-private partnership developers

3. Top competitors by business line

Business lineKey competitorsCompetition type
Grid & Power EPCLarsen & Toubro, Elsewedy Electric, PowerChina, GE VernovaDirect EPC competition and technology solutions
Renewable Energy & DevelopmentACWA Power, Masdar, EDF Renewables, PowerChinaProject development, financing and delivery
Infrastructure & ConstructionNesma & Partners, El Seif Engineering Contracting, AlbawaniEPC and mega-project construction
Water & DesalinationACWA Power, Metito, VeoliaWater development, desalination, EPC and O&M
Industrial & ProcessSamsung E&A, Technip Energies, WorleyIndustrial EPC and engineering
Digital Solutionssolutions by stc, Elm, SITEEnterprise IT, systems integration and digital transformation

I use this shortlist for marketing benchmarking. It is not a market-share ranking, and the relevance of each competitor varies by business arm.

4. Five priority competitors for marketing benchmarking

Elsewedy Electric official logo

1. Elsewedy Electric

elsewedyelectric.com

Closest broad benchmark for integrated electrical infrastructure, EPC, grid and renewable energy solutions.

Larsen & Toubro official logoL&T

2. Larsen & Toubro (L&T)

larsentoubro.com

Strong global benchmark for engineering construction, power transmission, large-scale infrastructure and EPC capabilities.

Nesma & Partners official logo

3. Nesma & Partners

nesmapartners.com

Important Saudi competitor in construction, infrastructure, industrial services and major project delivery.

ACWA Power official logoACWA

4. ACWA Power

acwapower.com

Strong benchmark for international renewable energy, water, project financing and asset development. More comparable to Alfanar Global Development than its construction arm.

PowerChina official logo

5. PowerChina

powerchina.cn

Large international competitor in power, renewables, infrastructure and utility-scale EPC.

5. Competitive indicator

Saudi power transmission projects by EPC contractor, based on a December 2025 industry report. Project counts are not overall company market share.

Alfanar
29
GE
16
Al Ghazal
16
Al Sharif
13
Nesma IT
12
Al Ojaimi
8
Elsewedy Electric
7
L&T
6

Source: Saudi Gulf Projects, December 2025 Power Transmission Projects Report.

6. Strategic recommendation for marketing assessment

For corporate-level benchmarking, I recommend Elsewedy Electric, L&T, Nesma & Partners, ACWA Power and PowerChina. I would compare positioning, digital visibility, website experience, communications, thought leadership and global presence.

For each business line, I recommend selecting three direct competitors, with initial focus on Grid, Renewable Energy, Water and Digital. My comparison would cover search visibility, case studies, technical content, decision-maker targeting and lead-generation opportunities.

Key question: Does Alfanar Projects' digital presence communicate its evolution from construction contractor into an integrated international project developer, EPC contractor and technology solutions provider?
03

Institutional Target Audiences – KSA & GCC

I recommend a dedicated audience matrix for governmental and non-governmental organizations, starting with Saudi Arabia and selectively expanding across the GCC. I separate direct buyers from influencers and strategic ecosystem partners.

1. Suggested audience segments

Target audienceExamples / typesStrategic valuePriority
Government authorities & regulatorsEnergy, water, infrastructure and investment authoritiesProjects, tenders, policies and market accessVery High
Government-owned entities & utilitiesSEC, National Grid SA, SWCC and relevant infrastructure entitiesDirect procurement and large-scale opportunitiesVery High
Industry associations & professional bodiesSaudi Council of Engineers, chambers of commerce, sector associationsNetworking, credibility, visibility and industry relationshipsHigh
Non-governmental organizations & foundationsSustainability, renewable energy, environmental and development organizationsPartnerships, ESG positioning and thought leadershipMedium
Business councils & bilateral chambersSaudi and GCC business councils, international chambersInternational expansion, partnerships and market intelligenceHigh
Research institutions & universitiesEnergy, engineering, AI and sustainability research centersInnovation partnerships, technical collaboration and talent accessMedium–High

2. Priority organizations and markets

  • Saudi Contractors Authority: industry relations and contracting-sector engagement.
  • Saudi Council of Engineers: engineering credibility and professional visibility.
  • Federation of Saudi Chambers: business networking and industry connections.
  • Asharqia Chamber: industrial and energy-sector relationships, networking and sector events.
  • Relevant sector bodies: associations connected with energy, renewable energy, water and infrastructure.

Geographic sequencing: KSA first; UAE and Bahrain next; Qatar, Oman and Kuwait based on commercial priorities and project pipeline.

3. How to approach these audiences

I recommend engaging these audiences through institutional relations, executive networking, industry events, technical thought leadership, partnerships, sponsorships and joint initiatives, with objectives tailored to each relationship.

Add three fields to the audience matrix

FieldOptions
Relationship roleBuyer / Decision-maker / Influencer / Partner / Regulator
Business relevanceGrid / Renewable Energy / Infrastructure / Water / Digital
Strategic objectiveLead generation / Market access / Brand authority / Partnerships
I recommend managing these organizations as a dedicated Institutional Stakeholders & Strategic Partners segment, with tailored relationship objectives and KPIs.
04

Social Media Audit

Outside-in assessment | 18 October 2026 | Publicly accessible information

Executive assessment

Alfanar Projects has a substantial LinkedIn presence and a foundation of corporate credibility. However, its social-media strategy appears more focused on communicating achievements and organizational developments than systematically influencing buyers, educating technical decision-makers or generating measurable commercial opportunities.

My assessment separates public observations from strategic interpretation. I reviewed accessible LinkedIn information; ownership of all other website-linked channels still needs confirmation. Internal social analytics were not available for this review.

1. LinkedIn performance overview

Alfanar Projects – LinkedIn
Construction · Riyadh, Saudi Arabia

Followers displayed · public snapshot813K+Dynamic public follower figure
Listed employees6,600+Profiles associated with company

What they are doing well

  • Corporate visibility: Large LinkedIn audience for an engineering and infrastructure business.
  • Major-project storytelling: Corporate updates covering flagship infrastructure, renewables and substation work.
  • Executive and institutional visibility: Leadership, government relationships, delegations and partnerships.
  • Bilingual communications: Arabic and English for Saudi and international stakeholders.
  • Brand consistency: “For the world. With the world.” messaging.

The figures and examples reflect the public-profile snapshot used for this review and may change over time.

2. Content strategy assessment

Content pillarObserved presenceAssessment
Project awards, wins and milestonesStrongClear proof of capability
Corporate news and announcementsStrongReinforces reputation
Events and partnershipsStrongRelevant to institutional relations
Employee and culture contentStrongSupports employer branding
Technical educationSomeOpportunity for deeper expertise-led content
Industry thought leadershipSomeShould become more systematic
Buyer-specific solutionsNot clearly establishedImportant gap to investigate
Case studies and measurable outcomesSome project evidenceMore commercial interpretation needed
Lead generation and conversionNot verifiableRequires campaign and CRM data

Project Excellence Award communications for the Bisha BESS project demonstrate capability proof points; AI-driven project intelligence posts show an existing technical-thought-leadership foundation that could be expanded.

3. Overall social channel audit

ChannelVerification statusStrategic assessment
LinkedInConfirmed and reviewedPrimary B2B and institutional engagement channel
YouTubeWebsite video embeds confirmed; specific channel not verifiedTechnical explainers and project documentaries
XAlfanar Projects account identified; ownership should be confirmed internallySaudi government, industry and event communications
InstagramProjects-specific account not verifiedPotential employer branding and visual storytelling
FacebookProjects-specific account not verifiedSecondary unless analytics demonstrate value

Alfanar Projects-branded X account: x.com/alfanarprojects (publicly discoverable; verify administration internally).

4. Strategic gaps and commercial opportunities

◎

Audience-specific communication

Different messages for utilities, government entities, project developers, EPC partners and engineering buyers instead of primarily broad corporate updates.

✦

From announcements to expertise

Develop technical case studies, engineering insights, executive perspectives and project lessons drawn from the existing resource library.

◇

Institutional and stakeholder engagement

Structure engagement with Saudi authorities, utilities, chambers, professional associations and relevant GCC institutions.

↗

Executive advocacy

Activate engineering leaders, project directors and business-unit executives as subject-matter voices.

▤

Commercial measurement

Connect impressions and engagement to target-account interactions, qualified website traffic, relevant inquiries and CRM opportunities.

5. Recommended LinkedIn content mix

Strategic test allocation, not an observed historical breakdown.

30% Projects & proof
25% Industry insights
20% Solutions & expertise
15% Partnerships & institutions
10% People & culture

My priority is to demonstrate expertise and business value, supported by a focused publishing plan and measurable audience response.

6. Data needed to complete the audit

To complete my baseline, I will request 12 months of channel analytics: follower growth, impressions, reach, engagement by content type, follower geography and seniority, referral traffic, paid social results and attributed leads. I will also confirm the owned-channel inventory across Alfanar Projects and its sub-brands to assess duplication, ownership, brand architecture and cross-promotion.

7. My assessment

Suggested slide takeaway
Strong Corporate Visibility. Opportunity for Greater Commercial Influence.

Alfanar Projects has established substantial corporate visibility, particularly through LinkedIn and project-led communications. The next opportunity is to build on that foundation with audience-specific thought leadership, technical storytelling, structured institutional engagement and measurable business-development outcomes.

Confidence: High for reviewed LinkedIn profile and content observations; moderate for interpretation; insufficient evidence for cross-channel performance and actual lead-generation effectiveness.

05

AI Marketing Automation Strategy

01Verified sourcesApproved project facts, public signals and authorized analytics
02AI analysis & draftingResearch, classify, summarize, localize and prepare
03Human approvalEngineering accuracy, brand consistency and commercial review
04Execute & measureApproved content, opportunity routing and performance feedback

I recommend extending Alfanar Projects’ use of AI beyond content creation into a coordinated marketing operating model.

My proposed operating model automates repetitive work across research, content, project marketing, stakeholder engagement, sales enablement and performance reporting.

My objective is to improve marketing efficiency, strengthen market intelligence and support business development across Alfanar’s business lines, with faster content production as one part of that broader outcome.

5.1 · Twelve AI marketing automations

#ProcessWhat AI can automateBusiness impactPriority
01Project-to-Content EngineTransform approved project information into case studies, LinkedIn posts, website content, and video scriptsFaster, consistent project marketingVery High
02Competitor IntelligenceMonitor competitors' websites, projects, tenders, announcements, and content strategiesBetter competitive positioningVery High
03Market & Tender IntelligenceIdentify relevant public tenders, infrastructure projects, and investment announcements in KSA/GCCEarlier commercial opportunity identificationVery High
04SEO & AI Search MonitoringTrack technical SEO issues, keyword performance, AI search visibility, and competitor mentionsBetter digital discoverabilityHigh
05Institutional Stakeholder IntelligenceTrack government authorities, professional associations, chambers, and key GCC organizationsStronger relationship and engagement opportunitiesHigh
06Content Repurposing & LocalizationConvert approved technical content into Arabic/English formats for different audiences and channelsLower production effortVery High
07Social Listening & Sentiment AnalysisMonitor brand mentions, project discussions, relevant industry topics, and sentimentBetter reputation managementHigh
08Marketing Performance ReportingConsolidate website, social, campaign, and CRM data into executive dashboardsFaster, more reliable decisionsVery High
09Executive Thought LeadershipSuggest timely subjects and prepare research-backed executive posts, articles, and speaking briefsStronger executive visibilityMedium–High
10Proposal & Sales EnablementRetrieve approved credentials, project references, and capabilities to support proposals and presentationsFaster responses to business opportunitiesHigh
11Event & Exhibition ManagementAutomate invitation segmentation, follow-ups, post-event summaries, and lead routingImproved event ROIHigh
12Website Content GovernanceDetect outdated project facts, broken links, inconsistent capabilities, and missing multilingual contentStronger accuracy and governanceHigh

These are my proposed use cases. I would confirm system readiness, data access, ownership and integration requirements before implementation.

5.2 · Five priority workflows

I would prioritize the following five workflows, starting with practical pilots and expanding once the data, approvals and operating responsibilities are established.

Example 01 — Automated Project-to-Content Engine

Approved project documents

Facts, images, results, milestones

AI extraction & content generation

Validate facts and apply brand guidelines

Editorial and technical approval

Then schedule approved content

I recommend piloting this workflow with Bisha BESS, then extending it to other documented project pages after the initial review and approval process is established.

Example 02 — AI Competitive Intelligence Agent

Automatically scans selected competitors weekly, identifies new project announcements, partnerships, campaigns and positioning changes, and generates an executive summary showing what matters to Alfanar.


Example 03 — Government & Stakeholder Monitoring

Tracks selected Saudi and GCC ministries, government agencies, utilities, chambers and professional associations. Flags relevant events, projects, initiatives and potential partnership opportunities.


Example 04 — Automated Marketing Performance Dashboard

Integrates GA4, Search Console, LinkedIn analytics, advertising platforms and CRM data where access is available. Generates weekly KPI reports, anomaly alerts and practical recommendations.


Example 05 — AI Tender & Opportunity Qualification

Monitors authorized tender sources, categorizes opportunities by Alfanar's business lines, checks eligibility criteria and project relevance, and prepares an opportunity brief for the business-development team.

5.3 · Implementation phases

I use the following value and complexity assessment to sequence implementation. These are planning estimates; pilot results will determine the final rollout.

AutomationBusiness valueComplexitySuggested phase
Project-to-Content EngineVery HighLow–Medium1
Competitive IntelligenceHighLow–Medium1
Stakeholder MonitoringHighMedium1
Marketing DashboardVery HighMedium–High2
Tender QualificationVery HighHigh2

5.4 · AI-powered Marketing Intelligence & Execution Hub

I propose one Marketing Intelligence & Execution Hub to connect the twelve use cases, giving the team a consistent process for sourcing information, preparing recommendations, securing approval and measuring results.

Alfanar AI Marketing Hub

One intelligence layer serving multiple marketing processes

Verified data sources → AI-assisted analysis and drafting → Human approval → Execution and measurement

I would align the hub with Alfanar’s project development, engineering construction, engineering services and digital solutions portfolio, with ownership and priorities defined by business line.

I recommend starting with two pilots: the Project-to-Content Engine and the Competitive Intelligence Agent. Together, they address content execution and strategic intelligence. I would use the pilot results to validate the operating model before expanding into the remaining workflows.

My executive recommendation

From AI-Assisted Content to AI-Enabled Marketing Operations. We can use AI not only to accelerate content production, but also to continuously capture market intelligence, identify opportunities, support stakeholder engagement, and make marketing decisions faster—while maintaining human control over accuracy, brand messaging and approvals.
06

Practical Execution Plan

01 · Outside-in social channel baseline

What the public evidence actually supports

LinkedIn: Official Alfanar Projects company page verified; the publicly indexed October snapshot shows approximately 809,701 followers, although displayed counts vary with crawl date and region. Recent accessible posts feature WPC Energy Congress, Saudi National Day, national infrastructure, corporate news and a wind PPA in India. This supports a finding of strong corporate communications, not a conclusion about engagement rate or lead generation.

ChannelPublic verificationWhat we knowWhat to do next
LinkedInOfficial account verifiedCorporate updates, events, project and employer-brand contentLog last 30 posts by pillar, format, audience, reactions/comments and CTA; calculate median post interactions
YouTubeProjects-owned channel not conclusively verifiedVideo is a useful format, but reach and ownership cannot be statedGet the official channel URL; log last 20 videos, views, recency, descriptions and funnel links
X, Instagram, FacebookProjects-owned accounts not conclusively verifiedDo not attribute Alfanar Group accounts to ProjectsConfirm URLs and ownership with marketing before benchmarking

Public links: Alfanar Projects LinkedIn · Official website. Performance baseline remains partial: impressions, unique reach, demographics, referrals and conversions need internal analytics.

Measurement worksheet: apply consistently across every verified channel

DimensionMetric / review methodOutput
PublishingPosts per month, format mix, bilingual splitChannel activity benchmark
ContentProject proof vs news vs expertise vs people vs partnershipsContent-pillar map
Public responseMedian interactions per recent post; comment relevanceIndicative public response (not reach-based ER)
AudienceAvailable follower geography, industry, seniorityTarget-account fit (requires admin access)
Business impactUTM referrals, qualified sessions, inquiries, CRM opportunitiesChannel-to-pipeline view (requires first-party data)
02 · Flagship campaign

Proposed concept: Engineering the Future, Project by Project

I propose an integrated campaign built around three documented Alfanar projects, selected to demonstrate distinct capabilities to defined audiences. My starting point is the official project information, supported by approved project photography and internal technical review.

Bisha BESS — photograph from the official Alfanar Projects project page

Bisha BESS

Grid · Saudi Electricity Company · 2,000 MWh; 488 battery units · Completed

Audience: utilities, regulators, grid decision-makers, developers.

Message: Grid resilience backed by tangible storage capacity.

Verified source →

Jazan Entertainment Complex — visual from the official Alfanar Projects project page

Jazan Entertainment Complex

Infrastructure · SEVEN · 73,000 m² built-up area · In progress

Audience: mega-project developers, government, infrastructure leaders.

Message: Integrated EPC delivery for quality-of-life destinations.

Verified source →

Alfanar Industrial City rooftop solar — official project photograph

Industrial City Rooftop Solar

Renewables · Alfanar Industrial City · 4 MW · Completed

Audience: industrial operators, facilities leaders, energy buyers.

Message: Practical industrial energy transition.

Verified source →

Integrated content package

AssetAdaptationDistribution & KPI
Project landing hubThree proof-led project stories, metrics and CTAsWebsite, organic/paid traffic · qualified visits
3 technical case studiesOne per project; context, challenge, Alfanar scope, documented outcomesWebsite + sales enablement · engaged accounts
6–9 LinkedIn postsCarousels, project metrics, engineer perspectivesLinkedIn · target-audience interactions, referred sessions
Three 45–60 sec editsProject footage, metric graphics, executive/narrated insightsLinkedIn/YouTube · completion, qualified viewers
Partner outreach kitApproved institutional and technical narrativeStakeholder outreach · meetings and responses

My proposed rollout: Week 1 — verification and approvals; Week 2 — content and creative production; Week 3 — Bisha launch; Week 4 — Jazan and rooftop solar launch; Week 5 — paid and organic optimization and reporting. I would treat this as a pilot and use the results to refine the next campaign.

03 · Project storytelling example

Bisha BESS: project storytelling approach

Verified facts: Client Saudi Electricity Company; location Bisha Region, Aseer, Saudi Arabia; completed; 2,000 MWh; up to 500 MW over four hours; 488 units; supports backup power, storage during lower-demand periods, use during peak demand and renewable integration. Official project source.

Step A · Structured brief prepared from the official facts

Business goal: I want to demonstrate engineering and grid-development credibility using documented project facts and clear audience value.

Audience: Saudi/GCC utility leaders, grid planners, renewable developers and institutional stakeholders.

Core message: Grid-scale storage helps balance supply and demand and support renewable integration.

Project evidence: project name, client, status, location, 2,000 MWh, up to 500 MW over four hours, and 488 battery units.

Editorial standard: I would include claims about uptime, cost savings, emissions, delivery speed or contractor scope only when supported by approved project documentation.

Step B · Before vs after

Baseline · Project facts

Alfanar Projects played a role in delivering a battery energy storage system in Bisha. The facility provides 2,000 MWh of storage using 488 units and can deliver up to 500 MW over four hours.

My assessment: this baseline communicates the figures, but needs a clearer grid challenge, target-audience perspective and reader benefit. It is a working example rather than a quotation from the company website.

My proposed case-study narrative

How Bisha BESS strengthens the case for grid-scale storage

As power systems add more renewable generation, storing energy for use when demand rises becomes increasingly important. In Bisha, Saudi Arabia, Alfanar Projects contributed to the delivery of a 2,000 MWh battery energy storage system for Saudi Electricity Company. With 488 battery units and capacity of up to 500 MW over four hours, the completed project demonstrates the scale at which storage infrastructure can support grid flexibility and renewable-energy integration.

My approach: retain the documented technical figures and explain the practical relevance without presenting qualitative benefits as measured project outcomes.

Step C · My proposed LinkedIn post

2,000 MWh. 488 battery units. One important step toward a more flexible power grid.

Grid-scale energy storage is becoming an essential part of modern electricity infrastructure. At Bisha in Saudi Arabia, Alfanar Projects contributed to the delivery of a battery energy storage system for Saudi Electricity Company, designed to store power during lower-demand periods and make it available when demand increases.

With up to 500 MW of capacity over four hours, the project demonstrates how large-scale storage can support grid reliability and renewable-energy integration.

Explore the project: Official project page.

#AlfanarProjects #GridInfrastructure #EnergyStorage

Step D · My pre-launch review

Before launch, I will secure engineering sign-off, confirm client and location details, validate each performance claim, confirm image rights, and obtain brand and communications approval.

Management takeaway

My recommendation is to establish a reliable channel baseline, convert existing project evidence into a focused flagship campaign, and introduce controlled automation with clear responsibility for technical accuracy, brand consistency and approvals.

Typography follows Alfanar Projects’ official Century Gothic regular and bold faces. Original font and brand rights remain with their respective owners.